| 2003-09-05 Accountable 
The accountable person in a team may or may not be the one who actually does 
the work in question, but she would be the one whose job it is to make sure it 
gets done, and would be the contact person for the clients and/or project 
manager. The person actually doing the coding is responsible for that 
bit of code - if a team is dividing up the work between them, different bits of 
code will have different responsible team members, but there"s only one team 
member who is accountable for it all. Aligned 
People and plans are said to be aligned when they"re in agreement. If the 
plan says that the developers should have completed a certain bit of work by 
now, and they have, then the work is aligned with the plan. If the project 
sponsor"s goals are the same as the business users" goals, then they are also in 
alignment.
 Business User 
The people within the client who will own and/or operate the system or site 
you"re producing. Note that the client doesn"t have to be an external one (you 
could work for the same people), or be a profit-making organisation.
 Business Requirements 
The tasks which the stakeholders need the system/site to perform, to fulfil 
business needs. This will start off at a high level, and iteratively drive down 
in increasing levels of detail until you have a functional spec. Again, 
"business" is a slightly misleading term - they don"t have to be profit-making 
requirements.
 Buy-in
 If you introduce new ways of doing things to anyone, particularly if they 
don"t have much choice about it (such as part of their job), it"s only fair that 
you work with Business Users or other stakeholders to make sure they"re happy 
with the new way of the world. Part of this is sensible User Centred Design, part is validation that you"re 
meeting their needs, and part is simple communication so that they know what 
you"re doing and why, before it"s all set in stone. The worst possible outcome 
is that the first they know about it is at the post-build testing phase - unless 
you like dealing with outright rebellion or sneaky subversion.Change Request Process (aka CYA for developers) 
Once you have a tightly defined scope, and you"ve signed up to delivering 
that scope within a specific time and/or budget, the last thing you want is for 
the scope to change, either by adding new things in, or by redefining the 
requirements. A Change Request process is a sensible, ordered approach to making 
sure that the build team don"t get blamed for over-runs caused by this kind of 
change. The basic process goes like this: 
Communications Plan (aka Comms Plan) 
Your project is changing the world - fantastic! But hadn"t you better tell 
people about it? Like all good things, this will take planning.The business requests a change, defining detailed changes to the 
functional spec and perceived benefits resulting from the change. 
The technical team analyses the detailed changes and conducts an Impact 
Analysis, highlighting the expected changes in costs and risks. 
The business weigh the change"s costs/risks against its benefits and 
decides whether or not to go ahead and accept the change. 
If the change is accepted, the project has a new scope, costs, timescales 
and risks, and the development team is no longer expected to meet the old 
ones.
 Constraints 
The business can (and often does) ask for the moon on a stick. But it"s 
important that you make them aware of the limitations of time, budget, technical 
strategy etc you"re working under. After all, is it realistic to support 
multi-thousand simultaneous users of a banking system if all you have is a 
single Win95 machine running Access and Personal Web Server?
 Deliverable 
The output of what you"re doing. It should be something obvious and tangible 
- for IAs, this might be wireframes or a site structure. For a CMS developer, it 
might be workflows. For the project manager, it might be the project plan.
 Dependency
 Something one tasks needs from another task before it can complete. So before 
you can cut up the site into templates in a content management system, you"ll 
need the HTML templates, which will need the visual design, which will need the 
branding, which will need the marketing strategy etc. Dependencies come in two major flavours: 
Due Diligence 
Before you sign up a supplier, you"ll want to follow up their references, 
look at their previous work, check their financial records (to make sure they"ll 
still be around to finish their work) and generally do some asking around. This 
is known as due diligence.End to Start, where I can"t start my work until you"ve 
finished yours. 
End to End/Start to Start, where you dripfeed your 
deliverables to me as you get them done, so I can get on with my work. An 
example would be where I can get started on producing HTML templates from your 
visual designs as soon as you start passing them over.
 Elapsed days/time
 The number of hours/days/weeks from start to finish of a piece of work. 
Elapsed days can"t be compressed by throwing more people at the work. An example 
would be obtaining a Merchant ID to accept credit cards. The bank will take the 
same number of days to do their due diligence, and there"s nothing you can do 
about it. Alternatively, if you put several people on a job measured in man-days, 
elapsed days is the actual amount of time taken to do the work.Expectation Management 
Here"s the situation: I expect you to deliver the moon on a stick, because 
that"s what was in your pitch. If I still believe that that"s what I"m getting 
when it"s delivered, and it"s not, you"ve got a problem because I think you"ve 
failed me. However, if you"d told me much earlier We can"t find a stick 
long enough, guv"nor, so we can"t do that. But we can get you a 
large balloon on a stick if that"s OK, then when I get a balloon on a 
stick, I"m not disappointed. Expectation management is another hard job for 
project managers (and their expectations need managing too), and they appreciate 
all the help they can get. Functional Spec 
A description of how the system will behave to a level of detail which lets 
the stakeholders (and in particular, the sponsor and other people with sign-off 
authority) decide whether it specifies a system which meets the business 
requirements.
 Impact Analysis 
No doubt your project will change the way things are done, and the costs 
incurred in doing it. Working out what the difference will be is impact 
analysis.
 Learnings 
What you learn from designing, building and launching this project. And yes, 
it is grammatically stupid.
 Man days
 Producing wireframe layouts for a site will take a certain amount of effort. 
If you put two people (of either gender) on it, they"ll split the work between 
them and the elapsed time involved will be reduced. The simplistic theory is that man days are fixed and are simply divisible by 
the number of people involved to find the elapsed time. In projects where 
communication is a major factor (as it is in nearly all IT projects), this 
doesn"t quite work - in particularly complex projects, adding people to a job 
may actually slow it down. This realisation was documented by Fred Brooks in 
Milestone 
Milestone planning is a fantastically useful planning method for when you 
don"t have all the timescales required for the plan. It"s solely based on 
dependencies, and allows you to set out a plan"s skeleton around the arrival of 
dependencies. Here"s an example of a milestone plan for usability testing:The Mythical Man Month. 
| Milestone: | Dependencies: "When we have..." |  
| Paper prototype Heuristic Inspection | 
Finalised wireframes available 
Heuristics standards available 
Heuristics inspectors available  |  
| Paper prototype user testing | 
Paper prototype heuristics inspection completed, changes agreed and 
implemented 
Finalised wireframes available 
Testers recruited 
Facilities requirements (ie testing environment) in place 
 |  
| HTML prototype heuristics inspection | 
HTML templates available 
Paper prototype testing completed, changes agreed and implemented 
Facilities requirements (ie testing environment) in place 
 |  
| HTML template prototype user testing | 
HTML prototype heuristics inspection completed, changes agreed and 
implemented 
Testers recruited (NB different testers from paper prototypes) 
Facilities requirements (ie testing environment) in place 
 |  
| Functional system prototype heuristics inspection | 
Areas of functionality available 
HTML prototype testing completed, changes agreed and implemented 
Facilities requirements (ie testing environment) in place 
 |  
| Functional system prototype user testing | 
Functional system prototype heuristics inspection completed, changes 
agreed and implemented 
Testers recruited (NB different testers from paper or HTML 
prototypes) 
Facilities requirements (ie testing environment) in place 
 |  Over-run 
So we"ve agreed that the wireframes for this site will take five days 
elapsed time, and cost £3000. If they don"t arrive in five days time, you have 
caused a time over-run, which will throw the rest of the plan out. If 
they also cost over £3000, you"ve caused a cost over-run which will 
break the budget. And be sure of this - unless you"ve managed to negotiate 
otherwise, your over-runs are your responsibility, not mine.
 Phases
 
Production 
If a system is in production, then it"s live to its end users.Discovery Phase 
Is there a situation which needs a project at all? This is where you find 
out by conducting a needs analysis of the current situation (do people 
want nasally fitted fire), and finding out if there"s a possibility 
of getting the resources you might need.
Initiation Phase 
This is the phase of the project where you do the initial planning, get 
go-ahead and (most importantly) get the budget to allow you to actually run 
the rest of the project.
Design Phase 
This is when you analyse the current situation, define the end situation, 
and decide on solutions to get you there. Surprising though it may seem, this 
is usually the hardest phase, and certainly the one which takes most creative 
thought. In almost all projects, the business (via the stakeholders) would first 
define its requirements, to clearly state what is to be built, then 
the technical team would define the technical solution to those requirements 
(ie how it is to be built). This order is essential to ensure that 
the project delivers against the business need - the thing which gained the 
project resources in the first place.Build Phase 
Now you"ve decided what you"re going to build and how, it"s time to go and 
do it. For junior developers, this is all they will see of a project, and more 
often than not, all they"ll care about.
Test Phase 
Does what you built actually work? Does it deliver against the 
design? Here"s where you find out, before you launch it.
Launch Phase 
This is where you"d train any business users, communicate to the rest of 
the stakeholders (including the public for Internet projects), move the site 
to production and register with Search Engines.
Evaluation Phase 
So, you"re live. The site or system performs everything which the 
Functional Spec said it would. But does the system deliver against the 
business need? Will you make the sales? Will your content managers update the 
content within a sensible timescale? You won"t know until it"s being used. 
Think of this as testing for the business requirements - in many cases, this 
is where the next iteration starts getting designed, with changes arising out 
of the live learning being added to the list of functionalities which didn"t 
make it into scope for this one. The usual choices at evaluation are: 
Kill (it doesn"t work, it won"t work, or it"s doing damage) 
Modify (it doesn"t work as planned, but could work if changed) 
Maintain (it"s fine as it is) 
Invest/Expand (there"s greater potential than expected and it"s 
worth throwing more resources at it to add enhancements)  Promotion 
The usual way to produce a system is to develop it in one environment, move 
it to another (which replicates the production environment) to test it, then 
finally move it to production. This forward movement is known as promotion.
 PSO
 PSO is a key concept in almost all projects where IT is involved. Based on 
the assumption that you"d rarely do IT stuff for its own sake, and even in those 
cases, there are non-IT implications, it says that any substantive project will 
have impact in three areas: 
ProcessAlmost all IT developments require a different way of 
working for someone. If you move replying to a site"s contact us form from 
freeform email to a job-based web application where admins take ownership of a 
contact and reply via a form, then this is a different process. Alternatively, 
if you"re selling products online, you"ll need to ensure that there"s a 
process for handling returns.
SystemsThis is the IT bit. Inexperienced developers sometimes 
assume that this is the only area touched by a systems project.
OrganisationYou"ll probably also need to organise your people 
differently. Introduce a new site, and it"ll need updating, so you"ll need to 
put some staff time into doing that, possibly by recruiting dedicated people. 
You"d work out how much staff time using an impact analysis, based on the 
new/changed processes involved. Alternatively, if you"re selling products 
online, you"ll need to be organised with someone to pack and ship it to the 
customers, and you"ll need to plan and get inventory to whoever"s going to be 
packing and shipping it to the customers. If you"re dealing with products with 
long lead times (like flowers or any complex industrial product), you"ll need 
to be organised to have the inventory and any production capacity and 
component sourcing correctly forecast a long way in advance.
 The more complex the project, the more significant Process and Organisation 
become. Systems becomes the "easy bit" at a surprisingly small scale.Resources 
Everything needed to complete the project, but particularly people and cash. 
Normally "people" also ends up meaning "cash", as they have this annoying habit 
of wanting to be paid. Risk Register
 What could go wrong with the project? What could go wrong with the system 
once it"s live? For each thing which could go wrong, what would be the impact of 
it happening? How likely is it? Combine all of those and you"ve got your 
register of risks. Normally you"d track these regularly through the life of the project with a 
red/amber/green traffic light summary. Red means that the risk is either Sales Spec 
An expression of the project"s deliverables expressed in a way that the end 
users or customers will understand and accept. Simply put, it"s the basis of 
what you put in the marketing copy, the press release, and the sales force"s 
pitch. Best practise says that this should be in terms of benefits to those 
customers, not in features (ie most customers won"t care that the site uses load 
balancing, but will care that it"ll be fast, and won"t suddenly die because one 
machine goes bang).Very 
likely with a medium or high impactor High impact with medium or strong 
likelihood. Green means Low impact and low likelihood. Amber is 
everything in between. Naturally, new risks are added as they"re discovered, but 
old risks are never removed from the register - they"ll just sit there at a 
comforting Green. Scope 
What the project has agreed to deliver. Once signed off, defend it with your 
life. The approved way to tell people
 Get stuffed, we didn"t agree to do 
that, and there"s no way we"re going to do itis Is this 
in scope? Scope-creep 
What happens when people have bright ideas for minor improvements to the 
design. Great ideas they may be (like
 Hey! It"d be really cool to separate 
delivery and invoice addresses to allow gifts), but if they"re not in 
the agreed scope, you don"t do them without a Change Request being accepted. 
Otherwise your work ends up being substantially more than you agreed to, but 
your budget and timescales haven"t changed. Sign-off (aka CYA part 2)
 You"ve completed the build, and walked 
through the system with your stakeholders. They haven"t made any complaints 
during the UAT, so you think you"ve delivered what you"re being paid to deliver. 
But how do you know? When you ask the sponsor to be paid, how do they know? When 
in a year"s time, the client starts complaining about your work, and that you 
didn"t deliver against their requirements, how do you prove otherwise if they 
sue? The only way you"ll know is if you get a signature, or a minuted meeting, or 
some other clear, unequivable record that whoever has authority to formally 
accept your work has done so. Once they"ve signed off on the work, they take all 
future responsibility for it being fit for purpose, so any come-back will land 
on their heads, not on yours. This also applies to the design phase. Someone will have to formally agree 
that what you propose is what they want. Then if there"s a complaint during 
build of Who asked for this? This isn"t right!, you can instantly 
stop the argument by pointing to the signoff and say It"s signed off. If 
you have a problem with that, it"s nothing to do with me. Of course, tensions arise when inappropriate people attempt to claim signoff 
rights (example - when the Technical Lead wants to sign off content in the 
absence of the project director (answer SLA (aka Service Level Agreement)When I sign off your technical 
infrastructure, matey, and not a day before), or when not all of those 
who need to sign off do so (say if one member of a board gives signoff to an 
external publication when the whole board needs to). But that"s stakeholder 
management... A contractually enforceable agreement on the quality of service provided. 
This is often used for planned uptime of a site (99.99% (or "four nines") is 
common - any unplanned downtime which exceeds this gets you money or other 
goodies back from your hosting provider), and turnaround time for support. You 
might also have an SLA for turnaround time of legal signoff of site content. The point of this is that you can make firm plans around whatever the service 
level you"ve agreed, knowing that even if you don"t get that level of service, 
you"re going to get compensated (and perhaps more importantly, not blamed) for 
slippages.Slippage 
What you get when you start running slightly over-time or over-budget. Too 
many late lunches and the project slips. As Fred Brooks put it: How does a 
project get six months late? One hour at a time. Sponsor 
The person (or representative of the organisation) who are paying for the 
project. Designing for the sponsor rather than the users may not end up with the 
best deliverable, but on the other hand, you"ll get paid. If the sponsor has 
different goals than the users, you have three choices:
 
Stakeholders 
Anyone with a valid interest in your project. If your project affects 
someone else"s work, they"re a stakeholder. Some stakeholders will have direct 
input into your project - some will even have signoff - while others will simply 
have a representative of their interests (a UCD specialist will represent the 
users for example).Educate the sponsor to supporting the users" goals (this is the ideal 
outcome) 
Support the sponsors goals (and get paid) 
Support the users goals (and get fired)
 Stakeholder Management 
Projects are hard when stakeholders have different agendas, goals and 
priorities. As well as managing the project, a big part of a Project Manager"s 
job is keeping the stakeholders aligned with each other and with the project 
team. Anything you can do to help will be appreciated.
 Technical Spec 
The detailed definition of how the system will meet the functional spec, 
down to a code level. Assuming that the system gets developed to the 
specification, it should be possible to provide ongoing support, maintenance and 
development of the system from this spec.
 TOR (aka PID) 
A Terms of Reference (or Project Initiation Document) is the gospel for the 
project. It contains the key parts of what, how, when and why the project will 
run. In most organisations, you won"t get the go-ahead or a budget without 
it.
 Validation 
OK, so you have a solution to the perceived business need. But will it work 
for the stakeholders? Will your security model, incorporating a 12-character, 
system defined, randomly generated, non-user-changeable password, be usable for 
the business users? And will it satisfy the requirements of the security folks? 
Well, why not ask them? And if they say "No", then it"s back to the 
drawingboard. Every design phase should be iteratively validated until you have 
something which works for the people you"re producing it for.
 Workstreams 
Most complex projects will have several things going on at once (normally 
with intertwined dependencies). Each is a workstream, and may be lead and run by 
separate people. For an online store, you might have a finance workstream, a 
logistics one, a creative design one, a technical build one and a project 
office. The only time representatives from all of these come together may be at 
a regular project meeting.