2003-09-05
Accountable
The accountable person in a team may or may not be the one who actually does
the work in question, but she would be the one whose job it is to make sure it
gets done, and would be the contact person for the clients and/or project
manager. The person actually doing the coding is responsible for that
bit of code - if a team is dividing up the work between them, different bits of
code will have different responsible team members, but there"s only one team
member who is accountable for it all.
Aligned
People and plans are said to be aligned when they"re in agreement. If the
plan says that the developers should have completed a certain bit of work by
now, and they have, then the work is aligned with the plan. If the project
sponsor"s goals are the same as the business users" goals, then they are also in
alignment.
Business User
The people within the client who will own and/or operate the system or site
you"re producing. Note that the client doesn"t have to be an external one (you
could work for the same people), or be a profit-making organisation.
Business Requirements
The tasks which the stakeholders need the system/site to perform, to fulfil
business needs. This will start off at a high level, and iteratively drive down
in increasing levels of detail until you have a functional spec. Again,
"business" is a slightly misleading term - they don"t have to be profit-making
requirements.
Buy-in
If you introduce new ways of doing things to anyone, particularly if they
don"t have much choice about it (such as part of their job), it"s only fair that
you work with Business Users or other stakeholders to make sure they"re happy
with the new way of the world.
Part of this is sensible User Centred Design, part is validation that you"re
meeting their needs, and part is simple communication so that they know what
you"re doing and why, before it"s all set in stone. The worst possible outcome
is that the first they know about it is at the post-build testing phase - unless
you like dealing with outright rebellion or sneaky subversion.
Change Request Process (aka CYA for developers)
Once you have a tightly defined scope, and you"ve signed up to delivering
that scope within a specific time and/or budget, the last thing you want is for
the scope to change, either by adding new things in, or by redefining the
requirements. A Change Request process is a sensible, ordered approach to making
sure that the build team don"t get blamed for over-runs caused by this kind of
change. The basic process goes like this:
- The business requests a change, defining detailed changes to the
functional spec and perceived benefits resulting from the change.
- The technical team analyses the detailed changes and conducts an Impact
Analysis, highlighting the expected changes in costs and risks.
- The business weigh the change"s costs/risks against its benefits and
decides whether or not to go ahead and accept the change.
- If the change is accepted, the project has a new scope, costs, timescales
and risks, and the development team is no longer expected to meet the old
ones.
Communications Plan (aka Comms Plan)
Your project is changing the world - fantastic! But hadn"t you better tell
people about it? Like all good things, this will take planning.
Constraints
The business can (and often does) ask for the moon on a stick. But it"s
important that you make them aware of the limitations of time, budget, technical
strategy etc you"re working under. After all, is it realistic to support
multi-thousand simultaneous users of a banking system if all you have is a
single Win95 machine running Access and Personal Web Server?
Deliverable
The output of what you"re doing. It should be something obvious and tangible
- for IAs, this might be wireframes or a site structure. For a CMS developer, it
might be workflows. For the project manager, it might be the project plan.
Dependency
Something one tasks needs from another task before it can complete. So before
you can cut up the site into templates in a content management system, you"ll
need the HTML templates, which will need the visual design, which will need the
branding, which will need the marketing strategy etc.
Dependencies come in two major flavours:
- End to Start, where I can"t start my work until you"ve
finished yours.
- End to End/Start to Start, where you dripfeed your
deliverables to me as you get them done, so I can get on with my work. An
example would be where I can get started on producing HTML templates from your
visual designs as soon as you start passing them over.
Due Diligence
Before you sign up a supplier, you"ll want to follow up their references,
look at their previous work, check their financial records (to make sure they"ll
still be around to finish their work) and generally do some asking around. This
is known as due diligence.
Elapsed days/time
The number of hours/days/weeks from start to finish of a piece of work.
Elapsed days can"t be compressed by throwing more people at the work. An example
would be obtaining a Merchant ID to accept credit cards. The bank will take the
same number of days to do their due diligence, and there"s nothing you can do
about it.
Alternatively, if you put several people on a job measured in man-days,
elapsed days is the actual amount of time taken to do the work.
Expectation Management
Here"s the situation: I expect you to deliver the moon on a stick, because
that"s what was in your pitch. If I still believe that that"s what I"m getting
when it"s delivered, and it"s not, you"ve got a problem because I think you"ve
failed me. However, if you"d told me much earlier We can"t find a stick
long enough, guv"nor, so we can"t do that. But we can get you a
large balloon on a stick if that"s OK , then when I get a balloon on a
stick, I"m not disappointed. Expectation management is another hard job for
project managers (and their expectations need managing too), and they appreciate
all the help they can get.
Functional Spec
A description of how the system will behave to a level of detail which lets
the stakeholders (and in particular, the sponsor and other people with sign-off
authority) decide whether it specifies a system which meets the business
requirements.
Impact Analysis
No doubt your project will change the way things are done, and the costs
incurred in doing it. Working out what the difference will be is impact
analysis.
Learnings
What you learn from designing, building and launching this project. And yes,
it is grammatically stupid.
Man days
Producing wireframe layouts for a site will take a certain amount of effort.
If you put two people (of either gender) on it, they"ll split the work between
them and the elapsed time involved will be reduced.
The simplistic theory is that man days are fixed and are simply divisible by
the number of people involved to find the elapsed time. In projects where
communication is a major factor (as it is in nearly all IT projects), this
doesn"t quite work - in particularly complex projects, adding people to a job
may actually slow it down. This realisation was documented by Fred Brooks in
The Mythical Man Month .
Milestone
Milestone planning is a fantastically useful planning method for when you
don"t have all the timescales required for the plan. It"s solely based on
dependencies, and allows you to set out a plan"s skeleton around the arrival of
dependencies. Here"s an example of a milestone plan for usability testing:
Milestone: |
Dependencies: "When we have..." |
Paper prototype Heuristic Inspection |
- Finalised wireframes available
- Heuristics standards available
- Heuristics inspectors available
|
Paper prototype user testing |
- Paper prototype heuristics inspection completed, changes agreed and
implemented
- Finalised wireframes available
- Testers recruited
- Facilities requirements (ie testing environment) in place
|
HTML prototype heuristics inspection |
- HTML templates available
- Paper prototype testing completed, changes agreed and implemented
- Facilities requirements (ie testing environment) in place
|
HTML template prototype user testing |
- HTML prototype heuristics inspection completed, changes agreed and
implemented
- Testers recruited (NB different testers from paper prototypes)
- Facilities requirements (ie testing environment) in place
|
Functional system prototype heuristics inspection |
- Areas of functionality available
- HTML prototype testing completed, changes agreed and implemented
- Facilities requirements (ie testing environment) in place
|
Functional system prototype user testing |
- Functional system prototype heuristics inspection completed, changes
agreed and implemented
- Testers recruited (NB different testers from paper or HTML
prototypes)
- Facilities requirements (ie testing environment) in place
|
Over-run
So we"ve agreed that the wireframes for this site will take five days
elapsed time, and cost £3000. If they don"t arrive in five days time, you have
caused a time over-run, which will throw the rest of the plan out. If
they also cost over £3000, you"ve caused a cost over-run which will
break the budget. And be sure of this - unless you"ve managed to negotiate
otherwise, your over-runs are your responsibility, not mine.
Phases
- Discovery Phase
- Is there a situation which needs a project at all? This is where you find
out by conducting a needs analysis of the current situation (do people
want nasally fitted fire), and finding out if there"s a possibility
of getting the resources you might need.
- Initiation Phase
- This is the phase of the project where you do the initial planning, get
go-ahead and (most importantly) get the budget to allow you to actually run
the rest of the project.
- Design Phase
-
This is when you analyse the current situation, define the end situation,
and decide on solutions to get you there. Surprising though it may seem, this
is usually the hardest phase, and certainly the one which takes most creative
thought.
In almost all projects, the business (via the stakeholders) would first
define its requirements, to clearly state what is to be built, then
the technical team would define the technical solution to those requirements
(ie how it is to be built). This order is essential to ensure that
the project delivers against the business need - the thing which gained the
project resources in the first place.
- Build Phase
- Now you"ve decided what you"re going to build and how, it"s time to go and
do it. For junior developers, this is all they will see of a project, and more
often than not, all they"ll care about.
- Test Phase
- Does what you built actually work? Does it deliver against the
design? Here"s where you find out, before you launch it.
- Launch Phase
- This is where you"d train any business users, communicate to the rest of
the stakeholders (including the public for Internet projects), move the site
to production and register with Search Engines.
- Evaluation Phase
- So, you"re live. The site or system performs everything which the
Functional Spec said it would. But does the system deliver against the
business need? Will you make the sales? Will your content managers update the
content within a sensible timescale? You won"t know until it"s being used.
Think of this as testing for the business requirements - in many cases, this
is where the next iteration starts getting designed, with changes arising out
of the live learning being added to the list of functionalities which didn"t
make it into scope for this one. The usual choices at evaluation are:
- Kill (it doesn"t work, it won"t work, or it"s doing damage)
- Modify (it doesn"t work as planned, but could work if changed)
- Maintain (it"s fine as it is)
- Invest/Expand (there"s greater potential than expected and it"s
worth throwing more resources at it to add enhancements)
Production
If a system is in production, then it"s live to its end users.
Promotion
The usual way to produce a system is to develop it in one environment, move
it to another (which replicates the production environment) to test it, then
finally move it to production. This forward movement is known as promotion.
PSO
PSO is a key concept in almost all projects where IT is involved. Based on
the assumption that you"d rarely do IT stuff for its own sake, and even in those
cases, there are non-IT implications, it says that any substantive project will
have impact in three areas:
- Process
Almost all IT developments require a different way of
working for someone. If you move replying to a site"s contact us form from
freeform email to a job-based web application where admins take ownership of a
contact and reply via a form, then this is a different process. Alternatively,
if you"re selling products online, you"ll need to ensure that there"s a
process for handling returns.
- Systems
This is the IT bit. Inexperienced developers sometimes
assume that this is the only area touched by a systems project.
- Organisation
You"ll probably also need to organise your people
differently. Introduce a new site, and it"ll need updating, so you"ll need to
put some staff time into doing that, possibly by recruiting dedicated people.
You"d work out how much staff time using an impact analysis, based on the
new/changed processes involved. Alternatively, if you"re selling products
online, you"ll need to be organised with someone to pack and ship it to the
customers, and you"ll need to plan and get inventory to whoever"s going to be
packing and shipping it to the customers. If you"re dealing with products with
long lead times (like flowers or any complex industrial product), you"ll need
to be organised to have the inventory and any production capacity and
component sourcing correctly forecast a long way in advance.
The more complex the project, the more significant Process and Organisation
become. Systems becomes the "easy bit" at a surprisingly small scale.
Resources
Everything needed to complete the project, but particularly people and cash.
Normally "people" also ends up meaning "cash", as they have this annoying habit
of wanting to be paid.
Risk Register
What could go wrong with the project? What could go wrong with the system
once it"s live? For each thing which could go wrong, what would be the impact of
it happening? How likely is it? Combine all of those and you"ve got your
register of risks.
Normally you"d track these regularly through the life of the project with a
red/amber/green traffic light summary. Red means that the risk is either Very
likely with a medium or high impact or High impact with medium or strong
likelihood . Green means Low impact and low likelihood . Amber is
everything in between. Naturally, new risks are added as they"re discovered, but
old risks are never removed from the register - they"ll just sit there at a
comforting Green.
Sales Spec
An expression of the project"s deliverables expressed in a way that the end
users or customers will understand and accept. Simply put, it"s the basis of
what you put in the marketing copy, the press release, and the sales force"s
pitch. Best practise says that this should be in terms of benefits to those
customers, not in features (ie most customers won"t care that the site uses load
balancing, but will care that it"ll be fast, and won"t suddenly die because one
machine goes bang).
Scope
What the project has agreed to deliver. Once signed off, defend it with your
life. The approved way to tell people Get stuffed, we didn"t agree to do
that, and there"s no way we"re going to do it is Is this
in scope?
Scope-creep
What happens when people have bright ideas for minor improvements to the
design. Great ideas they may be (like Hey! It"d be really cool to separate
delivery and invoice addresses to allow gifts ), but if they"re not in
the agreed scope, you don"t do them without a Change Request being accepted.
Otherwise your work ends up being substantially more than you agreed to, but
your budget and timescales haven"t changed.
Sign-off (aka CYA part 2)
You"ve completed the build, and walked
through the system with your stakeholders. They haven"t made any complaints
during the UAT, so you think you"ve delivered what you"re being paid to deliver.
But how do you know? When you ask the sponsor to be paid, how do they know? When
in a year"s time, the client starts complaining about your work, and that you
didn"t deliver against their requirements, how do you prove otherwise if they
sue?
The only way you"ll know is if you get a signature, or a minuted meeting, or
some other clear, unequivable record that whoever has authority to formally
accept your work has done so. Once they"ve signed off on the work, they take all
future responsibility for it being fit for purpose, so any come-back will land
on their heads, not on yours.
This also applies to the design phase. Someone will have to formally agree
that what you propose is what they want. Then if there"s a complaint during
build of Who asked for this? This isn"t right! , you can instantly
stop the argument by pointing to the signoff and say It"s signed off. If
you have a problem with that, it"s nothing to do with me.
Of course, tensions arise when inappropriate people attempt to claim signoff
rights (example - when the Technical Lead wants to sign off content in the
absence of the project director (answer When I sign off your technical
infrastructure, matey, and not a day before ), or when not all of those
who need to sign off do so (say if one member of a board gives signoff to an
external publication when the whole board needs to). But that"s stakeholder
management...
SLA (aka Service Level Agreement)
A contractually enforceable agreement on the quality of service provided.
This is often used for planned uptime of a site (99.99% (or "four nines") is
common - any unplanned downtime which exceeds this gets you money or other
goodies back from your hosting provider), and turnaround time for support. You
might also have an SLA for turnaround time of legal signoff of site content.
The point of this is that you can make firm plans around whatever the service
level you"ve agreed, knowing that even if you don"t get that level of service,
you"re going to get compensated (and perhaps more importantly, not blamed) for
slippages.
Slippage
What you get when you start running slightly over-time or over-budget. Too
many late lunches and the project slips. As Fred Brooks put it: How does a
project get six months late? One hour at a time .
Sponsor
The person (or representative of the organisation) who are paying for the
project. Designing for the sponsor rather than the users may not end up with the
best deliverable, but on the other hand, you"ll get paid. If the sponsor has
different goals than the users, you have three choices:
- Educate the sponsor to supporting the users" goals (this is the ideal
outcome)
- Support the sponsors goals (and get paid)
- Support the users goals (and get fired)
Stakeholders
Anyone with a valid interest in your project. If your project affects
someone else"s work, they"re a stakeholder. Some stakeholders will have direct
input into your project - some will even have signoff - while others will simply
have a representative of their interests (a UCD specialist will represent the
users for example).
Stakeholder Management
Projects are hard when stakeholders have different agendas, goals and
priorities. As well as managing the project, a big part of a Project Manager"s
job is keeping the stakeholders aligned with each other and with the project
team. Anything you can do to help will be appreciated.
Technical Spec
The detailed definition of how the system will meet the functional spec,
down to a code level. Assuming that the system gets developed to the
specification, it should be possible to provide ongoing support, maintenance and
development of the system from this spec.
TOR (aka PID)
A Terms of Reference (or Project Initiation Document) is the gospel for the
project. It contains the key parts of what, how, when and why the project will
run. In most organisations, you won"t get the go-ahead or a budget without
it.
Validation
OK, so you have a solution to the perceived business need. But will it work
for the stakeholders? Will your security model, incorporating a 12-character,
system defined, randomly generated, non-user-changeable password, be usable for
the business users? And will it satisfy the requirements of the security folks?
Well, why not ask them? And if they say "No", then it"s back to the
drawingboard. Every design phase should be iteratively validated until you have
something which works for the people you"re producing it for.
Workstreams
Most complex projects will have several things going on at once (normally
with intertwined dependencies). Each is a workstream, and may be lead and run by
separate people. For an online store, you might have a finance workstream, a
logistics one, a creative design one, a technical build one and a project
office. The only time representatives from all of these come together may be at
a regular project meeting.
|